Why we use parameters instead of hard code in datastage.

Answer Posted / hanug

We use parameters to reuse the job multiple times by
passing different values to the job parameters.

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Where the datastage stored his repository?

616


why do u need the IOS upgradation in a FC switch

1868


Can you implement SCD2 using join, transformer and funnel stage?

1080


Terminate Activity

837


What all are the different way to run a job?

639






In work load management there are three options of Low priority, Medium priority and High Priority Jobs which can be used for resource management. why this feature is developed when there is already jobs prescheduled by scheduler or autosys. what will be the use of workload management then?

1040


How many types of hash files are there?

610


What is the difference between an operational datastage and a data warehouse?

628


what is flow of project?

1557


Define ds designer?

766


Define Job control?

675


Differentiate between Join, Merge and Lookup stage?

643


What is difference between server jobs & parallel jobs?

623


Describe the main features of datastage?

652


what is 'reconsideration error' and how can i respond to this error and how to debug this

2117