if my 6 kva UPS gives 20 min. backup at 100 % load, then at
25% load what is the backup time?
Answer Posted / miarcle
100% load means = 20 minutes so
25%load means 4x20minit=80 minits
| Is This Answer Correct ? | 10 Yes | 2 No |
Post New Answer View All Answers
how can use ram
How we calculate orifice plat size???
Explain Gas Turbine startup and shutdown sequences
How will you calibrate an Absolute Pr.Transmitter of range 400mmHg absolute ?
What is the use of each wire in three wire RTD
please send me some question papers of HPCL aptitude test ?? please send it to bipinb.28@gmail.com ...
what different types of problems do occur while doing instrumentation commisioning and how to solve them? please explain in detail
In turbine what does term CDP, NH, HSSOC means.
Isometric drawings are generated during _________________ phase of a project
Why do we have earthing cable in branch cable and shield in the same cable?
what is the process for double acting cylinder pneumatic for 32' v/v
why fuse block is not used for AI signal?
What are primary elements of measuring pressure?
all questions related to instrument technician in any offshore oil and gas company.
What is the calibration procedure of Drum level transmitter if range is 0 to -400 mmh2o in lab?