What is the proportion of cement agg. and sand for M20,M25
and M30?
Answer Posted / ismail
M20 1:2:4
M25 1:1:2
M30 1:1:2
| Is This Answer Correct ? | 2 Yes | 25 No |
Post New Answer View All Answers
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
how to calculate the length diamond shaped striupps in column
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
Explain moment of inertia?
How much cement and water required for cement selery????
Soil bearing capacity formula
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
what is the method used for marking of cantilevers in hirise buildings by using theodolite
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
How do you maintain water pressure?
What are the phases inspections are done by local authority while construction?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
Formula for calculating the volume of bulb in underreamed pile