why AC cannot to be stored and DC cannot be transmitted?
Answer Posted / avadhesh
ac cannot be store for its alternating nature and first
positive half it is store charge and then in negative half
its discharge...
| Is This Answer Correct ? | 11 Yes | 3 No |
Post New Answer View All Answers
we have a 2.5hp Starite electric motor water pump,the elec motor burned out,we need to replace starting capacitor(old capacitor specs erased),what microfarad rating capacitor do we need? 110-125V
7- What is the Dissipation Factor and the difference between it and Insulation Resistance Test? 8- What is the task (function) of DC and AC reactors in power plant? 9- What is the task (function) of (open delta with earthed) in some types in transformers? 10- What is the base of the selection of the vector group in transformers? 11- What is the zig-zag transformer and its function by drawing in large detail? 12- What is the polarity ? 13- Why we make short between phase(R) in high side and phase (r) in low side in vector group test? Where High Side ( R ,S and T ) and Low Side ( r ,s and t ). 14- What are the time on delay and time off delay? 15- What is the vector group? 15- What is the task (function) of different types of vector group such as Dyn11 , Dd0 , YNd1,……..,?
What is slip in an induction motor?
In an ACB shunt trip coil and undervoltage coil operated normally( breaker open and charged). But closing coil not operating untill manually discharge and recharging. Any help.
our industries ht line so power fluctation(once drop of power please rectify causes
What is milivolt dop test in Busducts? What is its significance & procedure to do the test?
in battery charging room we find two fuses (one in positive other in negative cables ).why it is so?one fuse is ore than sufficient?
what is the difference between 50 hz freq. and 60 hz freq.? which is better and economic in them ?
How can I model an open-delta ground transformer for a network supplied by 4 unit GTG and power transformer in ETAP?
How to synchronization will be done between two DGs ?
Can anybody post questions asked in Engineers India Limited Interview? Thanks in advance.
What are the different circuits in thermal power plant?
Define rise time.
66kv under ground cable how to layaing in ground any special case two ckt r runing
Why does inductive loads consume KVARs?