how to calculate cable size, olr rating, contactor rating
and mccb rating,to below given details three phase motor
75 kw,415 v,.85 pf,50 hz?
Answer Posted / brakadeesh
motor rating 75kw,so it taken full load p=1.732*v*I*cosfy
i= p/1.732*v*cosfy
=123 amp. so we requared a cable to carry 123 amp
contonious rating. so require to run motor in star delta
starter . in star delta connection load current is 58% of
line current. we require 58% of 123 amp carring capasity
cable.it is around 71 amp.generly copper cable taking 4
times current of cable rating and alluminium cable taken
1.5 times of cable ratting .so for 71 amp carring alu.
cable 50mm2 suffisent but due to high starting curent its
take 70 mm2 cable ib best.
its overload relay ratting is in range to 71 amp. it to be
60-80 amp,and mccb rating is 2.5 times of full load =200
amp
is best.
| Is This Answer Correct ? | 50 Yes | 35 No |
Post New Answer View All Answers
What is an ideal transformer?
If I have 3 essential main switch board and 3 incoming electricity ,but only 1 genset running is that possible.
I have one ct of ratio 3000-2000/1 Amp its knee point voltage mentioned on name plate is 500-333/30mA-50mA at Vk/2. in secondary box there is three terminal named 1S1, 1S2, 1S3 then on which terminal obtained the knee point voltage ie 1S1-1S2 OR 1S1-1S3 & also specify the knee point voltage for the ratio 3000 from name plate.
How to convert 2 phase to 3 phase electricpower in induction moter?
what is load despatching
How to calculate no of Lighning arrestors are required for protecting 50mX 50m*20m cubical building and locations of LA?
how is calculated the quantity of weight in hot test xlpe?
how to calculate the formula of cable size if motor kw is given
what is submersible pump?what is different between motor and sub motor?
In a carnot engine with an efficiency of 40%, the heat rejected to the sink at 27 C is 60 kJ, then the heat supplied in kJ to the engine by the sources is
How to select the proper VSD to operate high inertial load
what work will do diffrential realay DG set
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
The Q-facr o of a coil given as wL/R. what will be shape of Q versus frequency graph.
How one may guess the direction from which the distribution line is incoming if there is no pole plate on poles?