How to connect field devices to PLC and DCS using a FIELD
BUS, DP,MOD BUS(please tell me any extra interfce or
adopters need in this case if we use remote i/o s)

Answer Posted / satish awate

PLC is programmable logic control in this field instrument are connected to input or output of PLC input & output. And PLC are connected to DCS system or SCADA or HMI by a RS232 or RS434 communication cable.

Is This Answer Correct ?    16 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

DEAR SIR/MADAM MY NAME IS ARKAPROVA BHATTACHARYYA.I AM A FRESHER INSTRUMENTATION ENGINEER.CAN YOU PLEASE SEND SOME QUESTION PAPERS OF GRADUATE ENGINEER TRAINEE EXAM OF DVC(DAMODAR VALLY CORPORATION).MY EMAIL IDs ARE arka_aec@rediffmail.com.

1980


please send data bank of quetions answers on analytical instrumentation.

1983


any body please send me the old question papers of ongc test.

2175


Question on maha cement

805


sir i m preparing for BARC but i am not getting any papers to prepare for this exam so please send me some sample papers to my i.d for the preparation of barc.

2540


Can any one send me IOCL instrumentation question papers.. i dont know the pattern of the questions and what to prepare can any one help me on this .. my email id is anwarnishil@gmail.com

2338


plz you help about Que paper of mahagenco previous your,any model paper relad to it{maharastra power genration}

2407


What are the key features of a Distributed Control System? describing the various layers (sensor through to business system interfaces) as well as the hardware, software and security aspects of the DCS.

2293


can any one tell me when ongc placement test and its forms is available????/ pls tell me if u know

2194


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2260


I am manjunath having exp in maintenance of chemical plants,know i want to do a design course INTOOLS,after doing design course can we get jobs in design field.sinve i dont have design exp..

1836


any body who gone thru recent iocl interview.INSTRUMENTATION questions. I need.

2574


I WANT SECURITY PAPER MILL, HOSHANGABAD TEST PAPER.KINDLY SEND TO MY MAIL ID

2865


i hav applied for the post of engg. in iocl so please require the past test papers fro instrumentation engg please please help me and send me the papers or tell me the pattern and type of ques asked in examination......

2159


pls suggest suitable MOC of diaphragm for pressure measurement of UREA grade solution service fluid.

3220