if my 6 kva UPS gives 20 min. backup at 100 % load, then at
25% load what is the backup time?
Answer Posted / gopalakrishnan
50 minutes
for example let us take four fans at 100% load for 20 minutes.
100% load means 4 fans = 20 minutes
75% load means 3 fans = 30 minutes
50% load means 2 fans = 40 minutes
25% load means 1 fan = 50 minutes
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
Explain why plc require in analog input 4-20amp & 0-10 volt?
how to calibrate Necleuonic level transmitter.?
How to Calibrate Ultrasonic Level Transmitter in field
There are two chlorination tonners both are connected to two pressure swithes and the pressure switch is connected to SOV which operates the valve to changeover the tonner selection i.e if pressure one tonner goes low the other tonner should come in line if it is inautomatic selection design a circuit using relays ?
How many types of sensor
Specify ideal accuracy of flow element like orifice plate, Ventury, Annubar. Ultrasonic flow meter etc.
How u will setup SPI(2007) on Citrix Server (Thin Client Mode)? Plz Justify?
I want to know about DDCMIS in detail ? please explain it. Also give name of reference books in which it is explained in detail in very simple manner.
May I have a brief note above the voltage barriers? Whats is the purpose? Please mail me if you've operational details, mail id: rajkumar.diice@gmail.com
Can any body tell me about SAP MAINTINANCE MODULE. WHAT IS its function and application. And study material Source about it. I shall be very thankful.
WHAT ARE THE INSTRUMENTAL DIAGRAMSOF VALVES?
Explain how thw analog to digital converter works with the circuit diagram
With N nodes and B branches what will have a network ???
Valve positioner and actuators in detail.
i need some objective type questions in instrumentation