during positive and negative half cycle of ac supply what
happenes in the load?
Answer Posted / k.prakashchandra
Load also varies in the same way
| Is This Answer Correct ? | 2 Yes | 7 No |
Post New Answer View All Answers
How does cost of generation from hydropower plant compare with other sources of electricity?
what is the difference between "Rotary bypass isolation switch and Normal bypass switch" pls share indepth techs?
May I know how much values to be set for earth fault, over current and short circuit values at 11kv side? I have 11kv van 1250amps rating. Present it's taking load 80amps?
WHY THE DIMENSION OF TWO SAME RATED MACHINE IS DIFFERENT ?
what is the difference between rectifier and converter and commudator?
What is CVT and what is relation with wave trap?
what will happen if earth of 33 kv cable (earthed system) is not connected to earthing pit?
what about SAP/MRP regarding manufacturing of electric motors and all drives?
How to calculate capacitor bank value to maintain unity power factor with some suitable example?
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
1) Explain why we don't link the two earthing system ht and mv on a pole mounted transformer sub-station.
While converting delta into star or star into delta ,the three values of resistances remains unchanged .Find out the value?Let In star R1=x;r2=x;R3=x On converting into delta,R12=x;R23=x;R31=x Find the value of x
What is DTR erection?
WHY THREE PHESE SYSTEM VOLTAGE APPLIED IN 440 VOLT
Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.