What r different reduction startergies in SAP PP?
Answer Posted / srinu
Reduction strategy means reduce the time intervels in the
Production.for example, overlapping and skipping.
| Is This Answer Correct ? | 9 Yes | 8 No |
Post New Answer View All Answers
List out the activities carried out in production planning?
What is meaning of customized reports?
How the process time is calculated in a wc when both labour, machine categories exist?
Special Procurement type 40 – proc. form alt. plant
Explain Kanban.
what is group bom? Is it possible to attach the drawing for a material to bom? How?
What does a PP Consultant do in his/her real time?
What are the basic dates?
What are the reports generated in product cost controlling information system?
What is planning file entry
What is scheduling
How to insert an inspection checkpoint at the end of an operation?
What happens to planned after it has been converted into production order ?
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?