how much nails used in 1 sq m shuttering
Answer Posted / madhava reddy nalla
2.5 kg to 3 kg for sqm of the shuttering
| Is This Answer Correct ? | 31 Yes | 35 No |
Post New Answer View All Answers
Difference between pre-tensioning and post-tensioning.
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
How to determine spacing of bars in slabs or beams
it is a corrected question." make a list of engineering property(properties) of soil.
How much cement will require for 1Rmt Skirting laying
Explain soil analysis?
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
How many litres of water used for curing of 1000sqft of slav
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
What is binding spacing of the rebars at lapping zones.
what is difference between fluidity and workability also how palsticizer works
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site