Give a brief idea about Control circuit wiring in
Substation...???
Answer Posted / k.prakashchandra
The control circuit is for opening and closing on command.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Starting current of a 10 HP induction Motor is ______ time’s full load current.
sir please send me previous year questions of jspl of electrical section through which i could prepare myself fpr the test.
Comment on the working principle of operation of a single-phase transformer.
i have install 750 kva distribution transformer at my site and want to do neutral earthing. what calculations should i follow to determine earthing conductor material and size?
Is it required to use Automatic transfer Switch in L&T panel board if we use AMF panel with DG set? How the single line diagram will be? Please forward the material to sreenu_207@yahoo.co.in
what is the sludge current
how meger function
What are the advantages of nichols chart?
Given a collection of points P in the plane, a 1-set is a point in P that can be separated from the rest by a line; i.e. the point lies on one side of the line while the others lie on the other side. The number of 1-sets of P is denoted by n1(P). The maximum value of n1(P) over all configurations P of 19 points in the plane is 18
how do we calculate length of starting time and repeated starting of a direct online starter?
what is earthing transformer? draw the winding dia.of earthing transformer.
I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.
When we have earthing mesh or underground earthing network in industrial plants, weather we have NT-S or NT-C-S kind of earthing system, so eventually weather we must use 4 or 5 wire in 400 volt level (For example 3×150+70 mm2 or 5×150 mm2) in this connection I would like to know exactly the paragraph of IEC or IEEE number
where can the transformer having vector group Yny0 be used??
What is the difference between a verilog task and verilog function?