Can anyone give an overview on Account Determination?
Answer Posted / sivakumar s
Material types is assigned to A/c Cat Ref, A/c Cat. Ref is
assigned to Val. Class; Val. Class is assigned to G/L A/c.
Val. Area also assigned to Val. Grouping code. Val.
modifier assigned to Val. class as well as G/L A/c.
Configuration :
OMWM : Activate Val. grp. code
OMSK : Create New A/c Cat. Ref; Val. Class. and A/c Cat Ref
is assigned to Mat. type.
OMWD : Assign val. area (plant) to Val. grouping code (0001)
OBYC : Assign Val. Modifier (0001), New Val. class, New G/L
A/c.
Now you can create new material and assign new val. calss
in Accounting 1 view. For this material you can create po,
and GR now debit in your GL account.
Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
What is the difference between cbp and mrp?
Explain the importance of the batch record?
What is negative stock? Under what business requirement yout will recommend negative stock activation?
What is dunning procedure? How can it be configured?
How is subcontracting used in case of mm?
What if i’m running a much older version?
What is split valuation? When is it used?
What is the importance of the batch record?
Explain return delivery?
How you can link a document to a vendor master record?
What is the sequence of determining the vendor : quota arrangement, source list, pir, old po. Arrange them in right sequence.
Which documents are used as references when we create po?
What is source list? What is the menu path to define a source list?
what is access number in access sequence how do we define that ?
what is cbp? What is the difference between cbp and mrp?