If i have 200 test cases and we have to execute but we
don't have time to execute all testcases.within 1 hour we
have to execute that testcases and prepare the test
report.so how i have to resolve this problem? is there is
any technique in the testing.
Answer Posted / amiya nandi
divide the test case among the members present so that time can be consumed..
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
why are installed water leakage detection system data centers & server rooms
what is the clear formula to calculate cable size for a load
in dc suppy frequency is zero why? if dc frequency is zero how to exist dc transients and ac transients
how does this job compare with others you have aplied for?
wheather the size of windings in motor and generator are the same
Iin ESP why positive is grounded ? why not negative ?
What are the factor to be consider for CT selection in 132kV substation?
It is desired to flood light the front of a building 42 meters wide and 16 meters hig.Projectors of 30 degree beam spread and 1000 watt lamps giving 20 lumen/watt are availabl.If the desired level of illumination is 75 lumen/m and show a suitable scheme.Assume the cofficient of utilization, deprecitation factor and waste light factor are 0.4, 13 and 1.2 respectively.
What is the working principle of CFL & T5 tube light & 40W tube light with electronic ballast?
current transformer balance the power level on both sides. e.g in case of step up, at secondary side voltage rise but current decrease and vice versa in case of step down transformer. but how this power level remains same in case of current transformer and voltage transformer
all details of DG UPS HVAC
how to calculate the formula of cable size if motor kw is given
what & how to check the lightning arrester
Write down the design procedure of commutaj.
Purpose of providing neutral isolation panel for parallel operation of diesel generator