Can i create Production order without bom and routing ?
lakshman

Answer Posted / tijo thomas

yes u can create a production order without BOM & routing.
Change the Config in OPL8 ( order type dependent parameters)
as routing optional. But it may ask for a sales order when
u try to create order using CO01

Tijo Thomas

Is This Answer Correct ?    25 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is scheduling

1614


What are traffic lights in mrp?

701


Explain what is the meaning of exploding a bom?

604


Integration between PP and MM Module.

1430


Question related to Production order status or status profile?

1008






How to move to the realization phase?

647


Explain Kanban.

1077


What is the need of mrp list if the stock requirement list is already given?

567


We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?

620


What is mrp list and what is the use of it?

589


any one can provide me some sample resume for SAP PP with 0 to 1 year experience?

3525


Mention what is the use of t-code cs20 in bom?

615


What is known as 'demand management'?

615


What is the use of mrp group?

630


We want to report on several status combinations like each order that has the status ‘not deleted’ and ‘not technically completed’. What set up is required?

569