What is GIS Substation and how it operate? where these type
of substation installed?
Answer Posted / ravi singh
GIS electrical substation-GAS INSULATED SUBSTATION
IT comprises of chambers filled with inert gas (as filled
in SF -6 )of bus bars,switch gears GIS S/STN are of
66/132/220/440 KV levels thease are imported mfd by
renouned companies viz siemens/ABB etc
EHT cables directly terminates to gis S/Stn these are
unmanned operated maintenance free
Thease aer installed where there is constaints of the
space/land because of compact size this saves costly land
cost of the GIS is appx 2.5 times than convential s/satn
butsince usage is increasing therfore in comming time cost
to come down to the 15% more to AIS
Ravi Sing
| Is This Answer Correct ? | 12 Yes | 2 No |
Post New Answer View All Answers
HOW TO CALCULATE AMPs OF CURRENT TRANSFORMER IN HT Panel
what should be correct gas pressures to be a 1.5 ac unite
What do you mean by dependent and independent voltage sources?
why surge protectetor work explain with the help of circut diagram?
how generator load test is conducted?what are the steps?
please send the last 5 years {{{JUNIOR ENGINEER - ELECTICAL, ELECTRONICS RRB CHENNAI and secundrabad}}} TECHNICAL question papers TO MY EMAIL ID dinesh100701@gmail.com
How we calculate the size of ht cable for any transformer
what are the differant std sizes of cable trenches?
which motor have relatively high power factor and what is reason for have high pf? 1.capacitor run motor 2.shaded pole motor 3.capacitor start motor 4.split phase motor
why do we measure VIBRATION in -24vdc and why we adjust gap voltage -9vdc to 10-vdc? i am trying to get this information since 5 years, yet i haven't get reliable answer, i hope i can get from you.
role of europe union in UK safety legistlation (electrical safety)
I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE
explain single phase series motor
What is use of starter and choke in tube light
What is the difference between line drop and percentage line drop?