Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

In ac motor,when dc supply is given what happend to the
motor?

Answer Posted / sundarrajan

motor doesn't run.
if the motore runs power loss is higher,efficiency of motor
is reduced.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is per unit calculation?looking for simple and strong explanation thk u

2618


When is lag lead compensator is required?

1176


what is difference between 9kv 5ka surge arrester and 9kv 10ka surge arrester.

1907


how the inner and outer body is separated in aircrafts?

1160


What do you mean by a phase angel of instrument transformer?

1157


work of choke in florocent tube circuit ?

2190


hi frnz,can somebody give me any project work? i am a 2nd year student & interested in practical works...plz give me some projects

2056


working principle of AC Servo Motor with its construction

8935


ht side line to earth voltage

1652


What will be the fault current of any system when its generation is 10% of BASE generation( FUll Load )?Will is 10% or the same as full base calculation?

1982


Can you used moeller lzm1 mccb in a dc system with 125vdc and 20ka short circuit current , beside is it have 24 or 48 volt shunt ? Beside how long current can through from An MCB shunt contacts? (like Z7-AS 24 V)?

2141


What is the suitable transmission voltage?

1118


Dear Sir I am living in Jaipur Rajasthan  now I did complete my b tech degree in electrical engineering in 2012  Sir how I gate certificate of competency for electrical supervisor

2051


please send me previose rrb junior engineer qustion papers

2205


We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.

1995