I am working in a process industry, in that there are
several sections devided in the SCADA screens and
individual sections may START independently. But sometimes
i am facing problem i.e, if section 2 Stopped by the
operator immediately Section 1 or Section 3 or Section 4 is
getting stopped can you expain the reason behind this?
Answer Posted / chandramauli sinha
There r various possibilities:
1. Its a common stop for all sections and are linked at
single command from SCADA screen.
2. Variable of section-1 is linked directly or indirectly
by process/ logic/ variable to other sections. On stopping
of Section-1, the process/logic of other section is
recognizing as fault and stops the respective sections.
please check that is there any link between these
sections...!
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is 1:1 redundancy ?
How to convert milliampares into flow??
Which is the best field foundation bus. ( FF ) Yokogawa, Honeywell or others ?
wich is coming the first HAZOP OR SIL
Working principle of magnetic flow meter ......and calibration procedure of e+h magnetic flowmeter...
What is standard of DCS panel design?and what is step of DCS panel design?wiring and type of connector(screw or DB connector)
Where is wet leg is used?
What is frequency factor in massflow meter? When using frequency output?
What is profibus?
Hi, I am Newely Joined in Construction company instrument engineer? Any one can Plz tell me How can I advanced preparation for Releated Engineering and construction Documents?
hello friends, can you please send me the model paper or question paper to be prepared for hpcl examinations????????? You can mail me at rahim_here@yahoo.com waiting for your reply........... help me .. plz.....
How is automatic reference junction compensation carried out in temperature recorders?
Explain the working of rota meter.
you are on site,the plant trips,you are approached by operations,what do you do?
Pl send the model question paper of mahagenco account officer post