For a 50MVA (138/69/13.8 KV) transformer, what would be the
maximum demand in order not to exceed 80% of its operating
capacity.
Answer Posted / m.premkumar
We cannot decide straight away to 80 %,It depends on what
is our Load, i agree we can go upto 80% of transformer
capacity, Say 40 MVA.I had the experiance we did wrong
calculation and we got 1500 KVA as MD but we are using only
200 KVA,so unnecessarily we are paying money to the
Electricity board.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Define rise time.
Explain in details how you would react to an unexpected incident when your supervisor or manager is not around to give instructions?
sir my exam is on 19/6/2013 under electrical branch pls send me sample aptitude questions as well as sample technical questions for jindal steel and power company
Good morning: I'm looking for some informations about the OLTC or the LTC: I wont to know what the function of the tie-resistor in during the operation of reversing/coarse operation Cordially
we have a lot of model of rectifier but thyristor rectifier is the most rectifier that use in power system. Do you know why this rectifier is used?
what is the minimum recommended leakage current of an earthed cable connected to the body or skid of an alternator
Please give me a erda placement paper
What are the characteristics of negative feedback?
ho can we calculate the conductor insulation value according to their ratings like voltage,current etc.how insulation value related with voltage,current and power of amachine
If not into production, how far did you follow the design and why did not you see it into production?
how does WTI work ?
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram
i have total 8 dg sets for synchronizing and 2 buscoupler,1 sectoin dg no 1,2,3,and 2 sectoin dg no 4,5,6,and last section dg no 7,8 ....if buscupler no 1 and 2 is off mode ..than dg no 1,2,3,will synchroniz of another dg sets?
Whether it is possible to measure energy at the input of rectifier transformer (12 pulse with very high odd harmonics)
What is Fire Panel ? How it works ?