plz send me last 5 years solved question paper of
sbi clerk post on my yahoo id.my yahoo id is
ven_mohanan2006@yahoo.co.in
thanking you
Venkatesh.M
Answer Posted / saranya.g
9
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
The house is big and lovely but since nobody uses it it is pretty much a white Elephant What does White Elephant mean?
If A can copy 50 pages in 10 hours and A and B together can copy 70 pages in 10 hours, how much time does B takes to copy 26 pages?
The mean of 100 bags was found to be 30. What will be the correct mean if at the time of calculation two bags were wrongly taken as 32 and 12 instead of 23 and 11?
analogy: cell: tissue::atom:?
A thief steals half the total no of loaves of bread plus 1/2 loaf from a bakery. A second thief steals half the reaming no of loaves plus 1/2 loaf and so on. After the 5th thief has stolen there are no more loaves left in the bakery. What was the total no of loaves did the bakery have at the beginning.
Number of digits with a 2 in them between 100 and 400?
g[0]=1,g[1]=-1,g[n]=2*g[n-1]-3*g[n-2] then calculate g[4]= ?
Find the next series: AE BH CM DU?
Mary's father's brother is Andrews Andrews daughter's son is Sunil Brothers name is Sam Who is Sam to Sunil?
Find perimeter of a trapezium with 3 sides given and distance between parallel sides given.
Two trains in the same direction at 50 & 32 kmph respectively. A man in the slower train observes the 15 seconds elapse before the faster train completely passes him. What is the length of faster train ?
If m-4 is 7 more than n then m+9 is how much more than n+2
in 8*8 chess board what is the total number of squares refer odel
A worker pay Rs20 a day ,he works 1,1/3,2/3,1/8,3/4 in a week.What is the total amount paid to the worker.
A can do a work in 8 days, B can do a work in 7 days, C can do a work in 6 days. A works on the first day, B works on the second day and C on the third day rely. that is they work on alternate days. When will they finish the work.(which day will they finish the work) (7+7/168)