what are the costing parameter ?
Answer Posted / shib shaw
I/P & O/P Plan Cycle .
Work center : Activity types and the formulaes,cost center
Routing : Activity Price Calculation .
BoM: which is the contributor of standard material cost
against the Product in Production order.
Cost Centre: Production Cost Center mapped in Work center .
Indirect Cost Center the value of CC which is Updated in
Product through Assessment Cycle .
which is contributor unplanned materialissues against the
product.
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
Explain what is prt (production resource tools) in sap pp?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
Different types of Object Dependencies.
Have you used Pull list or back flushing in REM?
What is a ‘bom’?
Tell some standard order types and what configure done for current project
What is standard order type
Special Procurement type 40 – proc. form alt. plant
What is the SPRO Path for requirement class and req. type?
What is requirement class and requirement type?
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
What is plm (product lifecycle management) in sap pp?
Checkdigit example
What is it 41 used for?