what type of qustions can i expect from soil mechanics
Answer Posted / v.kannan
in soil mechanics most of the question we can expect from
bearing capacity of soil why because the main aim of
studying of soil mechanics is to understand the soil
properties for structural foundations
Is This Answer Correct ? | 24 Yes | 4 No |
Post New Answer View All Answers
how much cement and sand required for 1cum rr masonry
which method is used in semi-rigid connection design??
The portion of a brick cut across the width is called?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
Water filter calculation formula
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
how to calculate MR 9(derivation)
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
will fix foundation bolts at site with out template is there any procedure?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.