A hollow cube of size 5cm is taken , with the thickness
of 1cm . it is made of smaller cubes of size 1cm . if the
outer surface of the cube is painted how many faces of the
smaller cubes remain unpainted?
Answer Posted / sinha
The above answer would be correct if the question would be that 4 sides are painted, BUT here its given all the sides are painted of the bigger cube..
So, no of painted faces = 25*6 = 150 (and not 25*4=100)
so answer here would be :-
588-150 = 438
| Is This Answer Correct ? | 46 Yes | 21 No |
Post New Answer View All Answers
The mean of 100 bags was found to be 30. What will be the correct mean if at the time of calculation two bags were wrongly taken as 32 and 12 instead of 23 and 11?
Bactria double every 3 mins. It is N in 1 hour, when was it N/4?
A batsman scores 23 runs and increases his average from 15 to 16. Find the runs to be made if he wants top Inc the average to 18 in the same match.
A person starts walking at a speed of 5km/hr through half the distance, rest of the distance he covers with a speed 4km/hr. Total time of travel is 9 hours. What is the maximum distance he can cover?
a number of subsets of a set s is 128, then s has
A person went to shop and asked for change for 1.15 paise. But he said that he could not only give change for one rupee but also for 50p, 25p, 10p and 5p. What were the coins he had ?
If a ball falls from 16 feet takes 4 seconds. How much time it will take when falls from 64 feets.
Draw venn diagram relating rhombus, quadrilateral & polygon
If ABC =C3C3 and CAB = D3D3, Then find D3÷B3D3÷B3
Write a C Program to declare an array for 2 0 floats. Accept the values from the user sort the two arrays in descending order. Merge the two arrays into a new array and display the new array.
In a party there are women and cats.There are 18 heads and 72 legs altogether. How many women and cats?
What is the least number of squares marbles required to pave the floor of a room 15 m 17 cm long and 9 m 2 cm broad?
A person runs 6 ft in 1/4 sec. how much it will run in 10 sec.
the average of seven numbers is 2.5 then their product
A works thrice as much as B. If A takes 60 days less than B to do a work then find the number of days it would take to complete the work if both work together?