in 3 phase (4 wire) star connection - is current pass through
neutral??
Answer Posted / md. obaydur rahman
We know that,in a star connection for balanced condition the
phasor sum of three line current is zero. As a result in
balanced condition there is no neutral current. But in
unbalanced condition the sum is not zero and a current is
flowed through the neutral wire.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
how we can do the insulation on secondary of ct explain and so that tan delta will within limit
How can we find the breaking capacity of a Load breaker switch (LBS) fed from 11 kv supply??ex:50KA, 26kA etc???detailed step vice answer pls.
Stator of 3-phase IM has 3 slots per pole per phase. If supply frequency is 50 Hz, calculate the speed of rotating stator flux A 1000 rpm B 500 rpm C 1500 rpm D 1440 rpm
What is use of starter and choke in tube light
Batteries used for electrical energy storage are a. Laclanche cells b. Edison cells c. Lead acid cells d.any of the above
how to ctrl motor by use of ac or dc drive.plz explain evdintly
I AM FROM ELECTRICAL ENGINEERING ? I AM ASPIRING FOR "BHEL".HOW I HAVE TO PREPARE .ON WHICH TOPICS TO BE CONCENTRATE MORE.PLEASE GIVE FULL DETAILS OF WRITTEN EXAM.
Distribution transformer we provided 2 separate earthing pit for Body and 2 separate earthing pit for neutral,we can not connect separate body earthing pit to other earthing pit but we do metal glanding in secondary side cable termination in both side, transformer and PCC panel (LT Panel), is this safe for transformer and other equipment?
What range of speed can you get with the armature control method of speed control of d.c. Shunt motor?
best manufacturer for busbar for outdoor switchyard having double bus bar scheme, can any one share technical specification of busbar. 132kv voltage ?
HOW TO CALCULATE THE HEAT AND LOAD OF LT-SUBSTATION WHICH CONTAINS 2*1MVA TRANSFORMERS,LT SWITCH BOARD,MLDB,ACB,BUSBAR,ETC...?
why swityard is necessrry requirement in any bis power distributin systems?
what is size of 3phase 4wire cable to be used for 11 ton ductable A.C and how to calculate cable size for different load
why normally Generator rating are between 11Kv to 22Kv?
what is the calculation formula for motor starting torque,running torque, running torque.