how much quantity a carpenter do shuttering per day
Answer Posted / m s khan
for slab = 8 to 10 beam=15,colmn=8to 10
Is This Answer Correct ? | 15 Yes | 18 No |
Post New Answer View All Answers
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
whats is difference between anchorage length and development length
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
Define aligned dimension?
In jack arch floor, the rise is kept?
what is tension column?
What is gravity flow?
what are the proper pipes for salt water line
how to conversation of all construction material in to brass
why building got air crack? if it get in one particular are what is means?