how much quantity a carpenter do shuttering per day
Answer Posted / m s khan
for slab = 8 to 10 beam=15,colmn=8to 10
| Is This Answer Correct ? | 15 Yes | 18 No |
Post New Answer View All Answers
What is the strength of cement?
in plate load test what is the thickness of plate 20mm 5mm 50mm none
Why nautical mile is different from statute mile?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
how to calculate the size of triangular ring in rcc column?
how much repeitation for conventional and maivan formwork?
What is the difference between built area and super built up area?
Define block?
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
what is the coefficient for running feet to cft coversion both area and price
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
List out some of the checking’s, done at the completion of construction?
What is the usage of zoom command?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
Tell me about triple point of water.