Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

In any Industry, Which voltage level either 3.3kV or 6.6KV
to be chosen? Then I would like to know ,Is there any cost
consideration or Rating of motor?

Answer Posted / kunal

for cost consideration of motor: It is tradeoff.. now if
high voltage rating is selected less current will flow for
same load . this will save costs on copper but at the same
time cost of insulation will increase. .....if lower voltage
is chosen then higher currents will result for same load. so
higher cost of copper but reduced cost of insulation.

for consideration of voltage for industry depends on the
load. and if heavy loads are present usually higher volatges
are chosen as losses due to current are far more.

MW rated motors will always be run on higher voltages.
higher the better.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How can we calculate strength of copper hich is supplying electric power to heater and in it hold the heater also and what r all types of forces which is acting on it...

1923


hi pal, i am vengatesh from tamilnadu(chidambaram),i have called for the written test for the post of jr executive(ELECTRICAL) of AAI ,I dont know about the question paper pattern,so any kindly help me to face the examination,post me the model question papers and some tips to write my examination to (vengi.annadurai@gmail.com)

1838


Can a generator runs after getting 1st stator earth fault.

1357


How many kinds of E.L.C.B and how to work E.L.C.B

1979


1. If 8.35%Z means the percentage impedance of 132kV-line from power company, we will like to reconfirm its base capacity.

1938


What is inrush current?

1099


What are the two major types of control system?

1045


which pump used in WTP explain the function of VFD how to dtermine capacitorbank of capacity one plant

1872


if you are in a software company,then why do you want to come in a core company like sail, ntpc(where lots of trouble like tension but you have a good life in a it company) ?

1857


can i able to get bhel previous exam question paper?

2057


wht is embedded systems? what is new inthis field?

1949


A ii kv 1200 A Breaker combination fixed in a cubicle. How many ampere Fuse is required? If fuse is not using, Why?

1929


What is the basic of DTH.

2259


what is submersible pump?what is different between motor and sub motor?

1997


(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)

1799