Answer Posted / ch amir islam
We use CASECAD loop to inhance the capability of the
process.normally we use this loop at BFW(boiler feed water)
tanks and at the BMS(burner managment system)to inhance the
burning ratio of fuel that become more relaiable for our
firing.because we are using here two controller(two
setpoints)these both controller makes process much more
flexible and accurate.
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
What is eddy current? Describe the operating principle of proximity probe.
Which is the best field foundation bus. ( FF ) Yokogawa, Honeywell or others ?
Difference between ultra sonic flow meter
Identification of ss fittings, pilot valves, relief valve.
What is three element drum level control system why its better than single element?
How do you identify an orifice in the pipeline?
What is the purpose of LO Overhead tank in turbines.
please tell me what is a light up procedure of Cfbc boiler and what it's axuillaries of cfbc boiler?
please send me the inteview questions in IOCL
What is stripper & spilitter ? Diffrence in this.?
What is the use of control cable?
Why do you want to work here
What is the difference between ff transmitter and non ff transmitter
What is defferent betwen ESP &PCP PUMP .HOW IT IS WORK?
Please tell me details about Sox,Nox,SWAS analyser????