Answer Posted / ch amir islam
We use CASECAD loop to inhance the capability of the
process.normally we use this loop at BFW(boiler feed water)
tanks and at the BMS(burner managment system)to inhance the
burning ratio of fuel that become more relaiable for our
firing.because we are using here two controller(two
setpoints)these both controller makes process much more
flexible and accurate.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
field bus transmitter calibration procedure tell me
i have steam drum height 1000mm. and i want to placed the transmitter below the tap.how i calculate.
State four different types of flow measurement, for gas flow measurement MMSCFD is the common unit expand the unit and specify significance of word S in the unit.
what is the input to be given in digital flow meter during the the calibration time?
What are the materials available to prepare individually for competetive exams in Instrumentation field? Plz reply...
Specific gravity.
hi,i am doing 3 year in electronic and instrumentation engineering. what type of aptitude questions will be asked in a core industries and how can i improve my skills in instrumentation?
i want to find out iffco get test paper
Q-Explain the different load conditions that will produced different offset which may or may not be acceptable to thhe control function
what different types of problems do occur while doing instrumentation commisioning and how to solve them? please explain in detail
what is maxdna ?. explain about the software details.
What is the purpose of LO Overhead tank in turbines.
why we are using drum level control valve air to close?
How would you choose differential range?
Why is the orifice tab provided?