A car travels a certain distance taking 7 hrs in forward
journey, during the return journey increased speed
12km/hr takes the times 5 hrs.What is the distance travelled
Options Are :
10Kms
20Kms
30Kms
40Kms
Answer Posted / k.praveena
30
| Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
Three cards are drawn at random from an ordinary pack of cards. Find the probability that they will consist of a king, a queen and an ace.
In base 10 representation for a rupee 100 paise,then base 8 representation what is rupee value?
There are 9 balls of equal size and same weight (they look similar) except 1. How may weighs required to find the dissimilar ball using a weighing balance?
The difference b/w the compound interest payble half yearly and the simple interest on a certain sum lent out at 10% p.a for 1 year is Rs 25. What is the sum?
There are five thieves, each loot a bakery one after the other such that the first one takes 1/2 of the total no. of the breads plus 1/2 of a bread. Similarly 2nd, 3rd,4th and 5fth also did the same. After the fifth one no. of breads remained are 3. Initially how many breads were there?
HOW + MUCH = POWER Then P + O + W + E + R =
4 pipes inlet and 2 pipes outlets, find water inlet etc.
From the below mentioned options choose the number that comes to 15 when divided by 4 and added by 9?
Fallin height is proportional to square of the time. One object falls 64 cm in 2 sec. than in 6 sec. from how much height the object will fall?
If A=Z, B=Y, C=X, .......... Z=A, Then GROUP = ?
+ means * and * means / and / means % what is the value of these question 2+3*5/7 it was two question of these type.
if on a salary of rs."S" per month,one has to pay one tax of x rs. And a second type of tax of y rs then % of salary taken home is?
r= 5 n = 3 . If first pole has 2 flags ,third pole has 1 flag how many ways the remaining can be arranged?
A is twice efficient than B. A and B can both work together to complete a work in 7 days. Then find in how many days A alone can complete the work?
A team P of 20 engineers can complete a task in 32 days. Another team Q of 16 engineers can complete the same task in 30 days. Then the ratio of working capacity of 1 member of P to that of a member of Q is: