What is meant by 'zero value' in quantity surveying.

Answer Posted / sathy

Difference between BOQ cost (As per agreement) and Actual
cost (after getting the project)

Is This Answer Correct ?    91 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

within an emergency scenario what are the safe systems of work a coss can setup as part of is duties

1586


may i know the detailed description of cutting length

1643


What is pre-stressed concrete?

669


What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

1749


How can we convert weight batch to volume batch for m30 mix

2443






What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code

1855


Describe the sections included in a typical bill of quantities

1794


What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??

1951


In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.

3716


How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?

1781


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

1816


how to calculate reinforcment in staircase cranked beam?

2194


What is meaning of tlc

1602


What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)

3796


how many kg of 20mm, 10mm, dust available in one ton stone boulder

1434