What is meant by 'zero value' in quantity surveying.
Answer Posted / sathy
Difference between BOQ cost (As per agreement) and Actual
cost (after getting the project)
| Is This Answer Correct ? | 91 Yes | 13 No |
Post New Answer View All Answers
How to fix toll charge for a particular vehicle at toll booths in a highway?
how water proof chemicals act in concrete to avoid leek?
What black man invented the clothes dryer?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
Define aligned dimension?
What is the difference between engineering stress and true stress?
What is the difference between routing maintenance and major maintenance in school facilities?
How many square meter can a worker/labor demolish a structure per day?
explain the rale of the government in the construction industry
What are the RISKS during the project construction?
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
What Reinforcements Are Used In The Process Of Prestressing?
What is an ortho mode?
why development length = 50D . why not 100D
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?