What is meant by 'zero value' in quantity surveying.
Answer Posted / sathy
Difference between BOQ cost (As per agreement) and Actual
cost (after getting the project)
| Is This Answer Correct ? | 91 Yes | 13 No |
Post New Answer View All Answers
What is absolute pressure? How absolute pressure is calculated?
How to design staircase.plz tell me formula for the design the staircase.
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
Define a polyline?
All aptitude question of Bechtel
how to convert cement, sand aggregate quantity from M3 to kg with full description?
How to activate isometric axes in cad?
What is the compressive strength of fly ash bricks?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
how to caluclate sienerge qty in construction in ap
what is the type of earthing
how to estimate material requirement for an area of house in square feet?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
How to calculate brick work quantity?? Block work quantity??
Form where IS456 is adopted in 1978?