As we know,charged clouds(from which lightning stroke
initiates)may be charged with either +ve charge or -ve
charge.
Now say one cluster of cloude is fully charged with +ve
charge & another cluster is fully charged with -ve charge.
In the sky these two cluster of charged clouds have come in
such a distance that, if they come clouser by some few
yeards then the lightning discharge will take place between
these two cluster of clouds. Under such a situation an
Aircraft came inbetween. what happend??
Answer Posted / shinyvikram
ya its simply related to grounding.
--- for a current to flow in a body ,we should compulsory
provide a closed path.
sice aeroplane is flying in the air-it is circuit is not
closed or its open circuit.
so, even though thunder strikes the plane,it doesnt cause
any effect on the plane
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
WE HAVE THE DC RECTIFIER 1500A, INPUT VOLTAGE IS 3 PHASE. HOW TO CALICULATE THE LOAD? 3 PHASE SIDE EITHER dC SIDE. PLEASE SUGGEST ME
briefly explain the main blocks found in a microprocessor based system
Why in power plant projects we see DOL starting method used for motors upto 160 kW instead of star delta method
What is the one main difference between ups & inverter ? And electrical engineering & electronics engineering ?
I am using submission of two ct in one and half scheme for 67/67N protection. Both CTs star point is grounded separately near ct box.Will two point ground give wrong tripping to 67/67N during fault or no matter.
Wind mill
why use phase displacement in transformer.and effect of phase displacement on transformer
What is resolver and glass scale in CNC how they work?
At the starting of dc motor and syn.motor and induction motor high current flowing through the winding. Due to this the windings burnt out. To avoid this different types of starters are used. But incase of transformer what Will be used (At starting no emf is induced in the primary winding)?
Why dry type cast resin transformers tap link blast in HV side while power shut down times on load?
What will happen if we introduce negative feedback to a control system that uses a positive feedback?
What is electrical grounding?
What is the function of retrip in busbar?
how does an encoder work???
How test for Ddo vector group test condition?