why is the vector group analysis done in transformer tests
Answer Posted / pratik
It is to be carried out to check whether the transformer
under test is suitable for parallel operation with another
transfomer having same vector group and voltage ratio but
difference in KVA rating.
| Is This Answer Correct ? | 192 Yes | 35 No |
Post New Answer View All Answers
What is the important precuations need tocarried out while working with Electrolite in Battery PM?
what are the application of over current relay?
how to calculate the loss tangent of electrical cables
What is the difference between a fuse and a breaker?
how to maintain frenquncy with syncronising sub-station for distribution
briefly explain the main blocks found in a microprocessor based system
How to measure the earth resistance value in a concrete pavement(flood light area)?
Capacitor is load free component but why ampere meter shows current when capacitor bank breaker close?
how we test a 3 phase motor on single phase supply....? HOW WE RUN A 3 PHASE MOTOR ON SNIGLE PHASE. supply for testing..? how we verify of a 3 phase motors 6 wire & name thame a1/a2/a3..b1/b2/b3 and c1/c2/c3 for connecting star delta starter ........i have only 1 phase supply ? help forum..........
In how we connect watt meter for open & short circuit test of a single phase transformer.
Single line diagrams for star to delta and DOL starters.
How do you calculate the actual power consumption of an inductive load appliance. Say, a deep freezer of 200watts
why do we have spikes enough to burn electronic boards, when generators are not grounded
How to setting the volume of RTCC panel AVR (11kv) controller
what are all the components required to assemble solar panel other than pv cell?