why is the vector group analysis done in transformer tests
Answer Posted / pratik
It is to be carried out to check whether the transformer
under test is suitable for parallel operation with another
transfomer having same vector group and voltage ratio but
difference in KVA rating.
Is This Answer Correct ? | 192 Yes | 35 No |
Post New Answer View All Answers
working principle of AC Servo Motor with its construction
Is the theorem applicable to ac sources?
What are the two segments of nyquist contour.
what is static frequency converter?what is the function...of sfc...?
If we need 4c× 50mm sq cable but it's not available so we can pull 4c×25mm sq two cables?
how oil in the MOCB was reduced compared with OCB? what are the features of the MOCB?
Why MCCB is Getting tripped sometimes when there is no load in the Midnight ?
What are the basic elements used for modeling mechanical rotational system?
What is marx circuit?
How to calculate the fuel consumption for 600kva DG genset which connecting with 25%load?
My question is abt backlog.I had dropped one subject in my second year, and completed this subject in the 3rd attempt, so how many backlogs i have got?1 or 3?plz sujjest the answer as soon as possible
What will be the fault current of any system when its generation is 10% of BASE generation( FUll Load )?Will is 10% or the same as full base calculation?
What is the numerical quantity of sqcm?
WHAT IS IEC? & WHAT IS BENEFIT TO PRODUCT FROM IEC?
What will be result if we connect LT votage to the terminal of HT motor?