Hi All,

This is regarding ETL testing. I have 3.5 years of
experience in software testing. I have used web and DB
testing so far. I am currently projected for ETL testing by
using which is very new to me. We are using Informatica for
running the sessions and taking the logs. I would like to
know whats the process we have to follow for this testing.
Ie., From kickoff to signoff. Can please anyone give brief
explanation on that.

Do we have any certification for ETL Testing??

Answer Posted / sachinsawant

Hi is it possible for you to share the copy with me too. <<sv.sachin@gmail.com>>
Thanks in advance.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain fault?

580


In white box testing, what do you verify?

909


What is latent defect?

592


Mention what the different types of test coverage techniques are?

613


What is the difference between negative and positive testing?

549






What is storage testing?

712


can any one suggest best institute for SAP TESTING and scope in SAP TESTING

1815


What is Lun masking? Why it is used?

1488


What is coverage measurement?

660


In which order should tests be run?

607


why is waterfall model not good?

707


9).explain difference between stab & driver? 10). who will conduct integration testing? 11). explain difference between system testing & functionality testing? 12). explain compatibility testing? 13). explain performance testing? 14). explain inter system testing? 15). explain difference between smoke testing & sanity testing? 16). explain difference between re-testing & regression testing? 17). you prefer manual testing or automation

3345


Your audit indicates that the corporate quality management system did NOT work as it should have. How should this finding be categorized? 1. Minor nonconformance 2. Major nonconformance 3. Deficiency 4. Observation 5. Catastrophic failure

2063


In the 7 Stages of the SDLC (Planning, System Analysis, System Design, Development, Testing, Implementation, and Maintenance), what is the INPUT and OUTPUT of each stage?

419


What is test result analyzer?

730