Is there is any formula for calculate the correct length
of rebar while it bending in 45 degree/90 degree and
cranking???
Answer Posted / kannadasun
Please refer SP 34 - 1987 - Handbook on Concrete
Reinforcement and Detailing. It has measurement calculation
for almost all shapes and diameter of rebars with figues.
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
which steel is better for residential building tmt steel or hysd steel
How many lbs are there in a yard?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
What is pre-stressed concrete?
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
For fine aggregate which is most suitable River sand or crusher sand & why ?
what mean By core Billing
Describe the role of independent Quantity surveyor?
What is alternate bid?
Explain what is progress payment?