what is the specification for silt content in sand
Answer Posted / dharmendra
x is the initial mark , but after adding water and waiting
for 1 hr then we have to take the SAND+SILT = A ml , and
then the only sand level say B ml
silt content = (A-B)/B *100
AND (X-B)/B*100 is BULKING OF SAND
| Is This Answer Correct ? | 39 Yes | 16 No |
Post New Answer View All Answers
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
How can i do RCC rate analysis?
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
Will going from a 3-tap to 6-tap increase water pressure?
what is the types of door's wood?
what is mean by reestimation?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
how do you stabilize a waterlogged area in road construction
How will you Engage Labours on Site?
What applicable rate of wct in bihar
for pretensioning which will yield first and same for post tensioning?
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
Define What is the distance between railway tracks?
Why reinforcement done in shorter span in two way slabs
What is the difference between engineering stress and true stress?