during site visit if i find voilation going on,what can i
do,how i act?
Answer Posted / alam
stop all jobs at site and call emergency meeting at site
and take strong decision to stop violation. after that
make complete document with picture and circulate to all
site responsible person
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
Why should you show Client/Engineer activities clearly on the project plan?
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
How to calculate quantity of plum masonry in 1:3:7
what is called the inverd level of mabhole chamber?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
yasser arfatcompleted his degree in civil from which university
what is parametre for M25 after 7 days strength
what is E
how we check the thickness and line of ceiling plaster.
What is the force exerted by the tacoma narrows bridge?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
What is the Hardness of M-40 grade concrete, general and theoratical