How to calculate battery back up time for a 400 AH battery
bank installed in telecom shelter for a load of 20 Amps and
time taken to fully charge this battery bank?
Answer Posted / dharmendra kumar gautam
20hours for fully charged of 400ah battery bank
| Is This Answer Correct ? | 12 Yes | 2 No |
Post New Answer View All Answers
How to calculate loses in transformer of 160 KVA ?
we have amp, voltage, kw, length detail then how to calculte copper & alluminium size of conductor of 3-phase induction motor
how does high earth to neutral voltage affect electronic equipment?
What descriptive information does the NEC require to be marked on all conductors?
please send me privious exam's queation papers of section engineer(electrical).
how to calculate the no load current in transformer?
what is the difference between skin effect
what are the pecularity of shaver sockets ?
What are root loci?
Can you please explain creepage distance in detail, for a 6.6kV cable head what must the distance be and how do you determine it?
Why there are some equipment(i.e:TV) that using 2-pin plug instead of three? What happen if there is current leakage? Are we going to get electric shock??
draw the full wave and half wave circuit of 3 phase system and inverter circuit used in upsĀ
why the value of k is more in shell typr transformers?
I am going to appear for the RRB Chennai junior Engineer online exam. Please send me the previous exams question papers (also solved) to my mail id: rrkhandhar@yahoo.com
any idea abt REVERSE METERING concept.........?