Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to check the SCAN time of DCS ,n dont give therotical
answers .How to check the SCAN time of DCS during FAT?

Answer Posted / rnm

In my opnoin, Sacn time checking during FAT shall be input
simulation with one repeater block. Then go for cycle sacn
rate check, which will cover input,process block(PID) and
output. We know, there wiil be no O/P connected in field
and no much execution of loops. In this case, very
difficult to conclude this time.Better to check I/O
scanning rate.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Make a ladder diagram on LSL valve will close, on PSL valve will open and start the motor

2125


what is the field bus calble ? what are diffrences in orang colur cable and black coular calble ?

2990


what is your eligibility criteria for freashers?

2121


what is the process to make control schematic ?

2233


what is the protection system in solar turbine compressor

2170


How many types of sensor

1608


all types instrumentation questions want

2157


what is orfics working in main steam line. is it increase pressure, velocity of steam flow and dicrease steam flow rate. or any other

2163


What is zener diode? What is voltage regulator?

1084


How to interfacing microcontroller with a DC motor

2031


what step is taken for ESD ( emergency shut down) in DCS REPLY to hashimka20009@gmail.com

2305


Explain why plc require in analog input 4-20amp & 0-10 volt?

1073


PLEASE PROVIDE SAMPLES OF CHEVRON SKILL TESTS

3877


field bus transmitter calibration procedure tell me

1817


Why boiler chimney area  oxyden sensor fixing? 

2465