3, 5, 8, 13, 24, 39, 72
FIND THE WRONG NUMBER
Answer Posted / lava kumar
Yup 22 is the correct Ans
Karthekeyan has forgot 13
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
A thief steals half the total no of loaves of bread plus 1/2 loaf from a bakery. A second thief steals half the reaming no of loaves plus 1/2 loaf and so on. After the 5th thief has stolen there are no more loaves left in the bakery. What was the total no of loaves did the bakery have at the beginning.
A number, when it is divided by 8 it gives a remainder 3 and is divisible by both 3 and 5. Find the number.
The distance b/w 2 places is 1000 miles and a man has a camel which eats an apple/mile. He has 3000 apples and want to transport from one to another. Camel can take 1000 apples at a time. when reaching the destination how many apples will be with him?
HOW + MUCH = POWER Then P + O + W + E + R =
modulo(373,7)+round(5.8)+truncat(7.2)-round(3.4) = ? i exactly don't remember the truncate function.but the function was where we skip the '.' part.
A cube 3"* 3"* 3" is painted green it is cut into 1"* 1"* 1" how many cubes were painted on atleast on one side
Two distinct no's are taken from 1,2,3,4......28. Find the probability that their sum is less than 13
he hour hand lies between 3 and 4. Tthe difference between hour and minute hand is 50 degree.What are the two possible timings?
what is topic on pz cussons essay writing?
with 4/5 full tank vehicle travels 12 miles, with 1/3 full tank how much distance travels
The ratio of no. of boys & girls in a school is 3:2 Out of these what % the boys & 25% of girls are scholarship holders. % of students who are not scholarship holders.?
On BRIC So called New york has risen by on average sales plese chewk the incorrect sentence option 1. so called 2. Has risen 3. By on average
It has 20 mixture contains mil and water in the ratio 3:5,replace 4 litres of mixture with 4 litres of water what is the final ratio of milk and water.
A can do a work in 8 days, B can do a work in 7 days, C can do a work in 6 days. A works on the first day, B works on the second day and C on the third day rely. that is they work on alternate days. When will they finish the work.(which day will they finish the work) (7+7/168)
starting from 2 upto how many numbers we need to check whether 907 is prime or not?