What"s mean by term of BOQ in construction?

Answer Posted / mohaideenag

BOQ Has 2 meaning
1) billing of quantity ( while doing in the project)
2) budget of quantity (before started the project)

Is This Answer Correct ?    21 Yes 21 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

residential projects,structural.

2406


How much cement and sand required for 9"brick wall per square metre

2479


cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building

1979


The definition of national highway

1337


225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.

2923






What is meaning of tlc

1598


What is the Hardness of M-40 grade concrete, general and theoratical

1660


what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????

1471


how can we calculate steel value, depending on load

1693


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1461


Explain the latest method to detect a crack in a building?

674


Special thing in designing a overhead reservoir ? which is different from an ordinary design

745


How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??

1593


what radial pressure, the NP2 class rcc pipe can sustain?

2889


Please let me know what is the simplest way of Calculating Mix Designs

1513