Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why alternate bars are given bent-up in slab and how to
decide the length of bent up?

Answer Posted / santosh singh

because it is economical and there is good anchorage.

length of bent up is L/4 OR L/5

Is This Answer Correct ?    27 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?

1117


How is calculate the cube molt

2216


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2810


how to conversation of all construction material in to brass

5389


What is Gsb tollens ?

1953


what is the weight of 12mm aggregates?

1508


how much cement and sand required for 100sqm of wall plastering in different proportions

2335


How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy

1974


please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches

2522


How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated

2120


To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?

1902


what is cross hair cursor?

1050


how water proof chemicals act in concrete to avoid leek?

2181


explain five benefits of using standard terminology in the measurement process?

2070


mix design procedure for 1:6 cement mortar

2174