curing of concrete why 7day's,14day's 21day's 28days
Answer Posted / deepak
curing is required to reduce the heat of hydration and
concret get its 70% strength in 7 days,so minmum time
required is 7days if we do for 14,21,28 days also.
| Is This Answer Correct ? | 19 Yes | 0 No |
Post New Answer View All Answers
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
what is the coefficient for running feet to cft coversion both area and price
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
What are wooden shingles?
How to determine thee cut length for steel reinforcement bars in R.C.C design
In which code the the maximum height of concrete casting has been explained
What do you mean by honeycomb in concrete?
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
what is the mode of method of face bar measurement
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
Why Vitrified tile are getting pop up.
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
What are the common ways of demolition?