curing of concrete why 7day's,14day's 21day's 28days
Answer Posted / deepak
curing is required to reduce the heat of hydration and
concret get its 70% strength in 7 days,so minmum time
required is 7days if we do for 14,21,28 days also.
| Is This Answer Correct ? | 19 Yes | 0 No |
Post New Answer View All Answers
Civil engineering material testing Standard results
how to create our resume?
how much one carpenter can doing shuttering of slab in one day
material used for mendrel use to bend epoxy coated rebar
What are the problems one might face while having a Cantilever balcony?
How many square meter can mason layout chb per hour
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
Calculation of Pier Cap with tapper area?
What is the basic difference between OPC
sir how can we find the cement and sand required for making 4" drop
What are some facts about concrete?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.