How to calculate transformer capacity requirement for a
project site?
Answer Posted / sivaguru
Hi Mr.Mahesh
Can you please forward the IEEE rule showing the
transformer loading of 80% of full load as you
discussed....Kindly forward it to my email id
sivaguru_691984@yahoo.co.in...
Even we haven't took tr. loading factor for all our
projects and we will be really educated by pupil like you
for the need of consideration of transformer loading
factor...
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
at what base you will tell the direction of rotation of dc motors and generators?
In a synchronous motor. if start is running at high speed. What will be the starting torque : Higher Lower Zero
What are electric motors?
Define non-touching loop.
what is the voltage regulation for unity and zero power factor?
Leakage current,un balance current which relay using for high voltage transmission?
What is tranformer differtial?
What are the advantages and disadvantages of the dc motors?
WHAT IS THE FAULT WHEN 100HP TURBINE MOTOR TRIPS, LIST THE FAULTS AND ITS TRABULESHOOTING TIPS.. MY AUTO TARNSFORMER STARTER TRIPS
In a tap changing transformer where is the tap connected, is it connected in the primary side or secondary side?
Dear Brother can u tell the proper size selection of cable & the fault level calculation of braker, busbar etc. pls mail me at azeemk30@gmail.com
Is it possible to use a S1 duty class motor for crane application (S4)? If not, why?
Distribution transformer we provided 2 separate earthing pit for Body and 2 separate earthing pit for neutral,we can not connect separate body earthing pit to other earthing pit but we do metal glanding in secondary side cable termination in both side, transformer and PCC panel (LT Panel), is this safe for transformer and other equipment?
How we can come to know the substation range,without go through any name plate ?
can anyone provide me a amf panel control wiring using ec-2 relay?