Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why we are not placing c.B 's btwn generator and transformer.?

what happens when generator gets disconnected from
transformer when it is running @ full load?

Answer Posted / selvakumar.t

When generator breaker opened at full load. Subsequently the
generator prime mover will go to over speed.We can use place
the breaker between generator and transformer through bus
bar. Because transformer was transmitting the power only.

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the voltage regulation for unity and zero power factor?

2251


what is the voltages using in movie theaters??? why ??why not other??

2222


During underground cabling in landscape area what did we cover the cable with to prevent the electric shock & protect the cable?

1802


when ID fan will immediately stop through VFD what exactly cause and problem the ID fan

1391


witch pump used in wtp

2048


What will happen to the protection and metering, if the polarity of a single or two PT/PTs in three phase system is reversed? Please provide reference if any.

2131


HOW MUCH CURRENT DOES SYNCHRONOUS MOTOR TAKES AT SYNCHRONOUS SPEED IN NO LOAD CONDITION ?

1807


What is the comparison between 30mA DP RCCB and 100mA DP RCCB and can replace it against 63A MCB

1536


what is the internal working of star delta starter

2055


Define what is the function of anti-pumping in circuit breaker?

1253


Why we are use dol starter up to 10 hp

1319


How to reduce the static electricity producing in solvent room? By P.D.Patil BioCon

2025


What is kvar?

1286


what is meant by LCR meter? where its useful ?

2000


A mass of 1200g is accelerated at 200 cm/s2by a force. The value of the force required is:(a) 2.4N(b) 2400N(c) 240 kN(d) 0.24N

2888