While connecting the flood light plug on to the 415 V
distribution panel,there was spark and the cable got burnt.
Three ignitors of the flood light also burnt of. The lamps
are of 400 W (total 6 lamps) connected through 1.5 mm2
cable. The plug was immediately removed from the circuit.
There was a 30 mA RCD connected and a 250 A MCCB; however
both did not trip. What could be the possible reasons for
the circuit devices not to trip?Can someone assist please.
Additional info if needed can be provided.
Answer Posted / albaloshi4u
check flood light another distribution box whether your flood light is working properly or faulty and also check your db phase voltage.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
1.how many earth pits are required for 1000 k.w plant include substion , transformer ? 2. how many earth pits are required for 500kva generator.what is formula to calcute?
what is the size of cable for 15kw motor and 85 meter cable length using with vfd
What is nichols chart?
I had applied for JE in PSEB, Can you pls send me the Question bank for related to my field
what is the difference between capacitive and resistive voltage divider?
why we take movement of rotor always in counter-clockwise direction in 3-phase induction motors?
How can we decide cable size from HT panel to Transformer? Please give you reply with some examples.
If we want to change a contactor of faulty one what are the conditions want to fullfil
How many types of losses occur in a transformer?
What is Icu and Ics and what is difference b/w them. please tell me how to calculate a size of a copper bar for a system or a breaker... reply on... king.arish@gmail.com would be waiting for a logical answer.
Transmission voltage is kept 11KV,33KV,66KV,132KV,220KV due to form factor. What happen to 400KV and 765KV transmission voltage?
how mass curve differs from hydrograph.
According to conduit size which size wiring & how many wires can we provide wires in conduit & how can we select conduit size accordingly?
how to maintain frenquncy with syncronising sub-station for distribution
What is the method of estamating of cable, CB,MCB ?