how pressure reduce through pressure control valve? suppose
we have to reduce 20 kg pressure to 10 kg pressure , then
what we do ? open the valve or close the valve , initially
it is 20 % is upon ( for ur knowledge ).
Answer Posted / g.s.arun
to open the byepass valve ,to reduce the pressure 20kg to 10 kg.
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
Name different types of bourdon tubes.
what is sil (safety integrity level
Drum level tx with GP4 with zero elevation:7300mmh20 on HP and 8050mmh2o on LP as range but on commissioning the tx readiing is max,Why this reading?
can anyone tell me about the basic concepts to consider before to start a PLC panel wiring
Instrument QA/Qc what is the project quality plan?conduit inspection RFI. which documents attache with package?
How will you calibrate an Absolute Pr.Transmitter of range 400mmHg absolute ?
1.what is the power consumption of three element drum level control in sugar industries? 2.how to reduce that?
Why do we have earthing cable in branch cable and shield in the same cable?
How to Calibrate Ultrasonic flow Transmitter in Field
How can i test procedure grounding for CAT-7 cable? Or How can we test procedure CAT-7 Cable Electrically safe?
How is automatic reference junction compensation carried out in temperature recorders?
What is stripper & spilitter ? Diffrence in this.?
dear friends, i have seen flow as the selection critriea in presure guage (bourdon tube) and i would like to know what is the relation between flow and performance of pressure guage other parameters i found in the data sheet are pressure max. 1ksc temperature max. - 50 deg c line size - 80NB operating range - 1ksc pr. guage range - 0-2 ksc thank u,
In my company plc based winders are operated. one day there was a data transmission failure alarm shown on pc. as per sir instruction we have reset master plc but winders were not triped and alarm gone. so what master plc do?
POSSITIVE PULSE IS APPLIED TO AN INVERTER INPUT.THE TIME FROM THE LEADING EDGE OF THE INPUT TO THE LEADING EDGE OF THE OUTPUT IS 10 ns. THE TIME FROM THE TRAILING EDGE OF THE INPUT TO THE TRYLING EDGE OF THE OUTPUT IS 8 ns. WHAT ARE THE VALUES OF tPLH and tPHL?