How much binding wire is required for one tone reinforcement ?
Answer Posted / sreenath
its normaly 6-8 for slabs and 5-7 for beams and columns
| Is This Answer Correct ? | 3 Yes | 13 No |
Post New Answer View All Answers
What is an ortho mode?
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
what is the hanekom repairing material after concreting work
How to find beam R/F cutting length
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
What are the advantages of cad software’s?
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
What is horizon or horizontal mining?
How to find out slope footing concrete
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
significance of specific surface area of particles?
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
how much of the strength comes from post-production curing
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?