in our sub station why we step down firstly 33kv\11kv then
11kv to 430v. can we direct step down 33v to 430.v.
Answer Posted / gurucharan singh
Yes 100% you can directly step down from 33KV to 0.430KV.
You must take care transformer sizing should be as per LV
switchgear available at your end.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
3 phase induction motor connection star or delta while using ac drive motor is .75 to 5.5 kw
what happen ehen synchronisation is done at below rated speed
Draw a block diagramof Three UPS systems connected in Parallel mode?
why we are not giving the zone 1 trip command to the master trip relay
What is quadrantal symmetry?
Is there a possibility to use such a treshold voltage for the NMOS part of a CMOS circuit that during the switching it will start conducting only after the PMOS part will be already closed, by this eliminating the leakedge current? Please note, I'm not asking about the well bias in standby mode, but about the "antileakedge" measures during normal operation.
The inventer is a battery, but if lost current at home u will turn on the fan but the is AC and inventer battery is dc . Then how the fan was rotating. What device Or machine in fan converst the Dc power to Ac power
Who many reason of ignition fail ?
testing of Vector Group – YNaoD II
Explain how you can give the overload setting to any Motor Protection Relay for a HT motors with formula and example?
what are the factors to be considered while design the breaker either HT or LT??
primery try cell?
what the principle of sincroscope?how it works?when it needed?
what is the stear deltaprinceple?
How should i design a 1ph & 3 ph transformer. Kindly let meknow all steps and formulaes related to design from scratch.