what is the cost of 475.5rs share with 4%discount and
1/4%brokerage
Answer Posted / rajasekaran
475.5 share with 4% discount = (475.5*4)/100 =19.02
and 1/4% brokerage, so 19.02/4=4.755
The cost is 475.5-(19.02+4.755)=451.725
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
If DBMDVUUB = CALCUTTA Then BOMBAY = ?
Three men goes to a hotel to stay ,the clerk says $30 per room/day so all the three plans to stay in one room so each pays $10.After some time the clerk realises that he made a mistake of collecting $30 but the room cost only $25,there fore he decides to return $5 to them so he calls the room boy and gives him $5 asking him to return. The room boy keeps $2 with him and he returns only $3($1 for each). Now Totally all have paid $9 each($27)+room boy $2 which is equal to $27.where did $1 go,who has made the mistake?
A ridge formed over Pacific Ocean was because of the intersection of two volcanoes. But in history it was written that it was not due to those volcanoes. It proves a contradictory to form the view that history will be proved wrong in the future.Inference?
f(X)-f(X-1)=f(X-8) FOR X>5 THEN X=
There are 5 red shoes, 4 green shoes. If one draw randomly a shoe what is the probability of getting red shoe
A company manufactures x refrigerators cp.(9000+500x0 sp=500x; what must be the value of x so that atlas the amount gained After selling is equal to the amount spent on production
If A/B = 3/5,then 15A = ?
5) Failure to use null indicator variable when referencing a nullable column will give the following SQLCODE a) +150 b) –001 c) +276 d) +305
2 persons are doing part time job in a company(say a and b). THe company is open for all the 7 days of the week.'A' works every second day.'B' works every 3rd day.If 'A'works on 1st june and 'B' works on 2nd june.Find out the date on which both 'A' and 'B' will work together.
a solution is prepared by mixing two solution with sprit 20% & 60%…In what ration they should be mixed to get the 50% sprit in resultant solution .
gavaskar average in first 50 innings was 50 . after the 51st innings his average was 51 how many runs he made in the 51st innings
A finishes the work in 10 days & B in 8 days individually. If A works for only 6 days then how many days should B work to complete A's work?
FIND the next number in the series 11,112,1124,11248,--
The size of a program is N. And the memory occupied by the program is given by M = square root of 100N. If the size of the program is increased by 1% then how much memory now occupied?
find R,M,(..),F,D,(..)