in our sub station why we step down firstly 33kv\11kv then
11kv to 430v. can we direct step down 33v to 430.v.
Answer Posted / ravinder
the rule of step down trf. 33kv\11kv step down in subsation
and get the one-by- one outgoing feeder's .
Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
Diagram and details of polarity test for Current Transformer 11kv 400/200/100/1A
While testing LA mast,What are the parameter limits ?
What happen in ups if phase reverse?
Hello everyone, somebody knows what is a "surplice power" ? The hole phrase is: "This rating is appropriate for a generator set paralleled with an infinite bus e.g. a national electrical supply network or grid where the generator set is run at 100% load, 24 hours a day, 365 days a year and any surplice power is exported into the grid" Thanks in advance.
What do you mean by an instrument transformer?
What are the no-load losses for the 11000/415V transformer with the following rated capacity? 1.1500 kVA 2. 2000 kVA 3. 2500 kVA 4. 3000 kVA
What is boucholz relay and the significance of it in to the trformer?
what is the requirement regarding earthing of Single conductor with AWA
What do you mean by Frame 5 Gas Turbine as well as Mark II.
True or false question. 1.The fuse provide phase and neutral 2.power loss in electrical circuit can take place in (resistance or inductance or capacitance). 3.two phase system each phase has separated by a phase difference of (90 or 180 or 270 or 45). 4.3 phase balanced star connected load neutral current shall be (line current or phase current or zero or unity)
I am having dual speed motor of cromton greaves make of 3.7 KW -1400 rpm and 5 KW - 900 rpm. Please let me know groups and winding connction for rewinding purpose.
am commissioning the trafo without connecting the neutral therefore unbalance will occur what is the alternative solution for this?
Calculate torque developed by the 3-phase, 5 H.P., 4 pole induction motor runs at 1500 rpm A 23 N-m B 21 N-m C 10 N-m D 0 N-m
what is earth resistance? how to measured? and give values at power station and mcc area?
why we are not giving the zone 1 trip command to the master trip relay