Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is backflush? what are the benefits of back flush?

Answer Posted / amit

Back flushing is nothing but automatic goods issue at the
time of confirmation. System automatically posts the goods
issue when you confirm the operations,thus saving the
manual efforts.
Eg. When a 4 wheeler automobile is rolled out from assy
line, 4 wheels & Tyres are deemed to be consumed and issued
to production order automatically by way of backflushing by
the system.
Backflush is used for material which are a must and having
fixed relationship.
This can be configured in MRP2 Screen,Work centre, Routing
and production order,the highest priority being the
material,though each has some special function.

Is This Answer Correct ?    15 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?

962


What is detail scheduling

1730


What are the t-codes for creating, changing and summarizing bom?

1085


Explain what is routing in sap pp?

1194


What is Planning time Fence?

1383


How to insert an inspection checkpoint at the end of an operation?

1153


What is golive actually? What is the role of a functional consultant in golive actually?

955


Explain what is the need of mrp list if the stock requirement list is already given?

961


What is the planning time fence?

964


Define mrp group

1008


Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?

908


What is phantom item & sub contracting

1836


How does sap know that an operation has components as indicated by the component allocation indicator?

971


Explain the process of Material costing.

1575


Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.

1924