Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how do we connect mcb in our home?and how does it work?

Answer Posted / amhirpara

in our home we connect mcb in paralal with load series with
main i/c when ther is ashort circuit at load side thermal
contact inside mcb will open and it tripped and give
protection again over load and short circuit condition

Is This Answer Correct ?    16 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

If we use 250A MCCB as a incomer in Control panel for a fault level of 50kA for one second ,assuming temperature rise from 85 Deg. to 100 Deg , Then what will be the Aluminium Bus-bar size for 250A MCCB? Explain in detail.

2351


what is the formula to calculate voltage drop/loss on 66KV Transmission Line?

3705


any body,pls tell me how to done relay coordination ? how to coordinate by TCC curve?how to read the tcc curve?

2152


is it possible to start a motor in felid connected to a remote mcc

1943


What is effect of harmonic current (Draw by VFD) on power system/ electrical Equipments ?

2084


what are problems caused by the pdu in rack server

2001


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

2038


what happens in the short circuited secondary transformer,if the resistance of the short circuit is increased gradually?

2375


What is the difference between voltages or potential difference? And what are they?

1086


What are dcs and plc?

1114


what is harmonics? what are the factors it will depend upon

2037


How do the synchronizing lamps indicate the correctness of phase sequence between existing and incoming alternators?

2200


condition Autotrip facia come on control panel of electrical transmission line?

1584


How much weight an electrical engine can pull??

2103


the typical output of a solar cell is........

2364